Mag. Johannes Meringer --> deutsch      
         
Selected Projects
Railwaytunnels Perschling
Expressway S36
Semmering Base Tunnel
Tunnel
Zigeunerbrücke
HPP
Deutschfeistritz

Semmering Base Tunnel
   
Project High Capacity Railway
Section "Gloggnitz - Muerzzuschlag", Austria
Semmering Pilot Tunnel
 
Details Investigation tunnel
Construction method: NATM
Cross section: 15 to 22 m²
Length: 4300 m
 
Client Eisenbahn-Hochleistungsstrecken AG (HL-AG)
 
Period 1995 - 1999
 
Services - Engineering geological tunnel logging
- Engineering geological consulting
- Evaluation of geotechnical data and preparation
  of tender documents