Mag. Johannes Meringer --> deutsch      
         
Selected Projects
Railwaytunnels Perschling
Expressway S36
Semmering Base Tunnel
Tunnel
Zigeunerbrücke
HPP
Deutschfeistritz

Hydropower Plant Deutschfeistritz
   
Project STEWEAG
Hydropower Plant Deutschfeistritz, Austria
 
Details Run-of-river power plant
Reservoir length: approx. 3.2 km
Installed capacity: 12000 kW
Rated capacity: 3000 kW
Mean annual output: 60 Mio. kWh
 
Client Prof. L.P. Becker, Graz
 
Period 1996
 
Services - Detailed geological mapping of dam abutments
  and reservoir slopes
- Diggability assessment of rock and soil to
  Austrian Standard B2205